SAP C_TS422_2020 certification is a valuable credential for individuals seeking to advance their careers in production planning and manufacturing. It requires a deep understanding of SAP S/4HANA production planning and manufacturing processes and can lead to new career opportunities and higher salaries. Individuals can prepare for the exam by attending SAP training courses, reviewing the official certification guide, and taking practice exams.


SAP C_TS422_2020 exam is a valuable credential for professionals who specialize in production planning and manufacturing within the SAP S/4HANA environment. By obtaining this certification, you will prove your competence in using SAP S/4HANA tools and techniques, which will help you advance your career and achieve your goals.

 

NEW QUESTION # 14
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question.

  • A. Material staging for next order in sequence
  • B. Reduction of associated capacity requirements
  • C. Archiving of documents for assembly scrap
  • D. Posting of production costs to the production cost collector
  • E. Posting of goods receipt for the product

Answer: B,D,E


NEW QUESTION # 15
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Production cost collector
  • C. Routing
  • D. Repetitive manufacturing profile

Answer: A,C


NEW QUESTION # 16
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Forecast planning
  • B. Consumption-based planning
  • C. Material requirements planning
  • D. Manual planning without check

Answer: B


NEW QUESTION # 17
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Transfer Order
  • B. Kanban
  • C. Backflushing
  • D. Picking list

Answer: D


NEW QUESTION # 18
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.

  • A. In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material
  • B. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
  • C. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
  • D. Manually firm all planned orders for materials within the replenishment lead time of the material

Answer: C,D


NEW QUESTION # 19
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?

  • A. Back flushing
  • B. Material requirements planning
  • C. Kanban
  • D. Production order release

Answer: B


NEW QUESTION # 20
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Make-to-order production (20)
  • B. Make-to-stock production (10)
  • C. Planning with final assembly (40)
  • D. Planning without final assembly (50)

Answer: C


NEW QUESTION # 21
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

  • A. Planning
  • B. Inspection during production
  • C. Implementation
  • D. Engineering change management

Answer: A,C


NEW QUESTION # 22
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
  • B. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • C. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
  • D. The new operation is inserted at the desired time the previously dispatched operation is moved backward.

Answer: D


NEW QUESTION # 23
What are some of the advantages of using Kanban? There are 2 correct answers to this question.

  • A. It is mostly accomplished by manual postings
  • B. It is a simplified form of production control
  • C. Replenishments are created close to the actual need
  • D. Replenishments are based on centralized planning

Answer: B,C


NEW QUESTION # 24
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • B. MRP creates capacity requirements only if the work center has sufficient capacity.
  • C. MRP creates capacity requirements without checking the capacity of a work center.
  • D. MRP assigns capacity requirements automatically after the last scheduled order on a work center.

Answer: C


NEW QUESTION # 25
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA.
When can you use mode selection?

  • A. When alternate resources are used within one operation
  • B. When multiple operations are maintained for one product
  • C. When multiple production versions are maintained for one product
  • D. When multiple planned orders exists in one resource

Answer: A


NEW QUESTION # 26
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.

  • A. BOM, in the item for the material
  • B. Material master of the finished product
  • C. Work center, in the production supply area
  • D. Material master of the finished product

Answer: A,C


NEW QUESTION # 27
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the phantom item indicator for the phantom assembly in the BOM.
  • B. Change the item category of the phantom assembly in the BOM.
  • C. Change the special procurement key of the phantom assembly in the BOM.
  • D. Change the explosion type of the phantom assembly in the BOM.

Answer: D


NEW QUESTION # 28
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When alternate resourcesare used within one operation
  • B. When multiple operations are maintained for one product
  • C. When multiple production versions are maintained for one product
  • D. When multiple planned orders exists in one resource

Answer: A


NEW QUESTION # 29
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are 3 correct answers to this question.

  • A. SAP C/4HANA
  • B. SAP SuccessFactors
  • C. SAP Field glass
  • D. SAP Concur
  • E. SAP Ariba

Answer: C,D,E


NEW QUESTION # 30
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Plant
  • C. Work center
  • D. Material

Answer: C,D


NEW QUESTION # 31
What are the consequences if operation status Dispatched is set for a production order operation?

  • A. You can reschedule the operation using finite Scheduling in a planning board.
  • B. You canreschedule the order using material requirements planning.
  • C. You can reschedule the operation using lead the scheduling.
  • D. You can reschedule the order using lead time scheduling.

Answer: A


NEW QUESTION # 32
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Scheduling control (finite/infinite)
  • B. Fixed pegging (on/off)
  • C. Finiteness level (0...1)
  • D. Direction (forward/backward)
  • E. Planning mode (bucket/sequence)

Answer: A,D,E


NEW QUESTION # 33
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question

  • A. WIP list
  • B. Operation list
  • C. Planning file entries
  • D. Production list
  • E. Production overview

Answer: A,B,E


NEW QUESTION # 34
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Create object selection variant for transportation lane-related alerts.
  • B. Assign the alert profile to the overall profile.
  • C. Create object selection variant for product-related alerts.
  • D. Create object selection variant for resource-related alerts
  • E. Assign the overall profile to the authorization profile.

Answer: B,C,D


NEW QUESTION # 35
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.

  • A. Material master
  • B. Work center
  • C. Bill of material
  • D. Routing header

Answer: A,C


NEW QUESTION # 36
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.

  • A. Supply Chain Management (SCM)
  • B. Integrated Business Planning (IBP)
  • C. Capacity Requirements Planning (CRP)
  • D. Material Requirements Planning (MRP)

Answer: A,B


NEW QUESTION # 37
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named "W1904_1000_001". What does the suffix 001 in the resource name represent?

  • A. Capacity category
  • B. Work center category
  • C. Available capacity version
  • D. Number of individual capacities

Answer: A


NEW QUESTION # 38
......


SAP C-TS422-2020 certification exam is a valuable credential for professionals in a range of industries, including manufacturing, logistics, and supply chain management. Holding this certification demonstrates a high level of expertise in SAP S/4HANA production planning and manufacturing processes, which can lead to increased job opportunities and higher salaries.

 