PracticeTorrent C-TS422-2020 Dumps Real Exam Questions Test Engine Dumps Training
SAP C-TS422-2020 exam dumps and online Test Engine
SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Process Orders in SAP S/4HANA | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Introduction to SAP S/4HANA Supply Chain Planning | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Master Data in SAP S/4HANA | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Capacity Planning in SAP S/4HANA | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Introduction to SAP S/4HANA Production Planning | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Advanced Planning in SAP S/4HANA | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Lean Manufacturing in SAP S/4HANA | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Material Requirements Planning in SAP S/4HANA | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
NEW QUESTION 82
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question
- A. Planning file entries
- B. WIP list
- C. Production overview
- D. Production list
- E. Operation list
Answer: B,C,E
NEW QUESTION 83
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
- B. The assigned routing must be a rate routing.
- C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- D. The lot size range must be within the lot-size range of the assigned routing.
- E. The assigned routing must NOT have alternative sequences.
Answer: A,C,D
NEW QUESTION 84
For what production type are production orders used?
- A. Replenishment controlled by control cycles
- B. Discrete manufacturing processes
- C. Period and quantity-oriented production
- D. Process manufacturing processes
Answer: B
NEW QUESTION 85
A planner updated a production order status from partially confirmed "PCNF"to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?
- A. The warehouse clerk still carry out goods issue transactions
- B. The production operator cannot enter additional confirmations
- C. The production manager can still see the capacity requirements
- D. The buyer can still see component reservations
Answer: B
NEW QUESTION 86
Where do you maintain the duration of a producton operation?
- A. Work instructions
- B. Routing
- C. Material master
- D. Bill of material (BOM)
Answer: B
NEW QUESTION 87
Which data object can be updated with the scheduling results of a routing?
- A. Material master
- B. Production version
- C. MRP profile
- D. Production scheduling profile
Answer: A
NEW QUESTION 88
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question.
- A. Confirmation profile
- B. Operation control key
- C. Production scheduling profile
- D. Scheduling margin key
Answer: B,C
NEW QUESTION 89
What does the industry sector determine? Note: There are 2 correct answers to this question.
- A. Whether material numbers are assigned internally or externally
- B. Which transaction you can use to create a new material
- C. Whether a material master fieldis required, changeable, displayed, or hidden
- D. Which material master views can be maintained
Answer: C,D
NEW QUESTION 90
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
- A. The Individual/Collective indicator of the component
- B. The MRP Type of the component
- C. The item category of the component in the BOM
- D. The Planning Strategy of the finished product
Answer: A
NEW QUESTION 91
You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question.
- A. Backwards
- B. Squeezing in
- C. Infinite sequencing
- D. Forward with reverse
Answer: A,D
NEW QUESTION 92
Which transaction code can you use in SAP S/4HANA to enter and display goods movements?
- A. MIGO
- B. MMBE
- C. MBNL
- D. MBO2
Answer: A
NEW QUESTION 93
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
- A. With respect to a common key date for product and each assembly
- B. With respect to a defined separate change status for product and each assembly
- C. With respect to defined separate key dates for product and each assembly
- D. With respect to a common change status for product and each assembly
Answer: C
NEW QUESTION 94
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed? There are 2 correct answers to this question.
- A. Create and assign setup group/setup keys in the production data structure.
- B. Create and assign a setup matrix with setup transition time to the resource
- C. Create and assign a new graphical object for setup time in the planning board.
- D. Run setup minimization heuristics or optimizer.
Answer: B,C
NEW QUESTION 95
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
- A. Repetitive manufacturing profile
- B. Bil1 of material
- C. Production version
- D. Cost collector
Answer: C
NEW QUESTION 96
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Forecast planning
- B. Consumption-based planning
- C. Material requirements planning
- D. Manual planning without check
Answer: B
NEW QUESTION 97
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Sales order-specific stock is created
- B. Production orders are created with sales order reference.
- C. Storage location MRP areas are required.
- D. Sales order-specific planning run is required.
- E. Net requirements calculation is sales order-specific.
Answer: A,B,E
NEW QUESTION 98
When do you use variant bills of materials (BOMB)?
- A. When a material has multiple BOMB
- B. When a material has a configurable BOM
- C. When multiplematerial is have similar BOMB
- D. When multiple material also have the same BOM
Answer: D
NEW QUESTION 99
When do you use variant bills of materials (BOMs)?
- A. When a material has multiple BOMs
- B. When multiple master also have similar BOMs
- C. When multiple master also have the same BOM
- D. When a material has a configurable BOM
Answer: C
NEW QUESTION 100
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.
- A. Use a specific MRP type.
- B. Use a specific material group
- C. Use a specific MRP controller.
- D. Use a specific material status.
Answer: A,C
NEW QUESTION 101
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- A. The Change Planning Direct on indicator is set.
- B. The planning strategy is infinite.
- C. The work center has several individual capacities.
- D. Alternative resources are fully occupied.
Answer: B,C
NEW QUESTION 102
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Integrated Business Planning (IBP)
- B. Capacity Requirements Planning (CRP)
- C. Supply Chain Management (SCM)
- D. Material Requirements Planning (MRP)
Answer: A,C
NEW QUESTION 103
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with an alternative sequence in the routing
- B. A production line with more than one work center
- C. A production line with prioritized alternative work centers
- D. A production line with a parallel sequence in the routing
Answer: B
NEW QUESTION 104
What is the first step in the MRP run?
- A. BOM explosion
- B. Source determination
- C. Lot size calculation
- D. Net requirements calculation
Answer: D
NEW QUESTION 105
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Reduce the planning window.
- B. Form optimum sequences to reduce setup times.
- C. Select an alternative mode on a resource.
- D. Adjust the available capacity.
- E. Execute a new production planning run.
Answer: B,C,D
NEW QUESTION 106
Which of the following functions can be performed when the production order has the status "Created" (CRTD)? Please choose the correct answer.
- A. A user trigger material availability check via mass processing (transaction COHV)
- B. A user can trigger material staging via mass processing (transaction COHV).
- C. A user can schedule a background job to release production orders (transaction COOIS).
- D. A user trigger printing of shop floor paper manually (transaction CO02).
Answer: B
NEW QUESTION 107
......